44 · Development and logistics
Building a Technical Fabric Brief
End use, construction, composition, GSM, width, colour, finish, tests, quantity and timing belong in one controlled brief.
Values to be checked
- Values to be checked 01
- End use
- Values to be checked 02
- Technical targets
- Values to be checked 03
- Approval route
- Values to be checked 04
- Commercial terms
Development and logistics
Technical brief, sampling, capacity, lead time and delivery terms are managed in one decision plan.
Sampling and Approval Plan
Lab dips, yardage samples, pilot cuts and pre-production approvals need a purpose, owner and decision date.
46MOQ, Lead Time and Capacity Planning
MOQ is modelled with colour count, machine load, yarn supply, tests and the approval calendar.
47Export Packing and Logistics
Roll presentation, palletizing, moisture protection, Incoterm, document set and delivery point are clarified at quotation.